4.9 Stars on Google
$1,864.67
Hydraulic Power Pack, -125 MTE
Lead Time: 30 Days
KIT for Customer to Convert EXISTING manual lift 60″ or 72″ 400 Series to single-phase 60Hz electric power lift. Use existing cylinder.
KIT for Customer to Convert EXISTING manual lift 60″ or 72″ 400 Series to single-phase 60Hz electric power lift
KIT for Customer to Convert EXISTING manual lift 96″ 400 Series to air power lift. Fits models made since Aug. 2004.
Fully enclosed crate for export of 1-305 with GEK. Heat treated and certified IPPC compliant.