4.9 Stars on Google
$1,372.27
OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 520-125 S/N 249855-______. Critical components to reduce risk of downtime and eliminate ship time.
Lead Time: 15 Days
KIT for Customer to Convert EXISTING manual lift 500 Series to air power lift. Use existing cylinder.
OPTION: Factory Installed Green Battery on NEW drum handler. Environmentally friendly lithium-ion battery with up to 5 yr. design life.
Fully enclosed crate for export of 1-305 with GEK. Heat treated and certified IPPC compliant.
PailPRO Below-Hook Pail Karrier. Hand wheel pail tilt. Web strap secures 11-12″ (28-30.5 cm) diameter pail. Ships w/ load test certificate