4.9 Stars on Google
$1,313.77
OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 525-N-120 SN 242094-_____. Critical components to reduce risk of downtime and eliminate ship time.
Lead Time: 15 Days
OPTION: Factory Installed Green Battery on NEW drum handler. Environmentally friendly lithium-ion battery with up to 5 yr. design life.
KIT for Customer to Convert EXISTING manual lift 60″ or 72″ 400 Series to single-phase 60Hz electric power lift. Use existing cylinder.
VERTICAL-LIFT DRUM POURER, 60″, 1-PHASE 50Hz AC POWER LIFT, HAND CRANK DRUM TILT, 800 Lb. CAPACITY
Fully enclosed crate for export of 1-305 with GEK. Heat treated and certified IPPC compliant.