4.9 Stars on Google
$88.66
OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 83 S/N 1105 TO ____. Critical components to reduce risk of downtime and eliminate ship time.
Lead Time: 15 Days
KIT for Customer to Convert EXISTING manual lift 60″ or 72″ 400 Series to air power lift. Use existing cylinder.
VERTICAL-LIFT DRUM POURER, 60″, 1-PHASE 50Hz AC POWER LIFT, HAND CRANK DRUM TILT, 800 Lb. CAPACITY
Fully enclosed crate for export of 515, 525, 611 or 620 Series. Heat treated and certified IPPC compliant.
14 GA ventilated locker with a shelf, hanger rod, and 2 coat hooks. Fully assembled and backed by a 25-year warranty.