You’ve already told your customers about the move, acquired your new location, taken growth and workspace into consideration, taken inventory of your things, defined roles and responsibilities for key staff , detailed description of the new layout – now for the actual physical move. You can handle a few boxes here and there – but what about the BIG stuff?
If you have warehouse equipment that needs to be relocated, this requires an experienced crew of installers with a proven track record of tearing down and safely reassembling material handling equipment. It’s not a second thought – it’s a necessity!
Equipment Relocation & Space Planning
Our installation manager, Richard Fargason, was fast at work to get the crew started on dismantling and relocating the equipment. The Reynolds Company had a tight deadline to meet and we took proper planning to ensure we finished within their timeframe.
Pallet Rack & Shelving
Pallet rack and shelving systems were soon torn down, securely bundled, and transported to the new facility. Our organized team worked quickly with Randy Levi’s guidance to get the moved equipment installed in its new designated location. We reinstalled their standard pallet rack, cantilever pipe rack to store conduit, reel rack for spools of wire, and wide span shelving. Safety yellow guard rail was installed to protect the rack and shelving units from forklift damage.
Brand New Showcase Shelving
The Reynolds Company now had a new storefront area where they wanted to showcase products.
Relocated & Installed – On time as usual!
With the equipment safely and securely installed in their new location, The Reynolds Company had plenty of time to focus on their grand opening on August 15! We were honored to play a part in their successful site opening and partner with them for their continued growth as a company.