Starrco Modular Building System Flint TX Project

Flexible & Fast Warehouse Office Space with Modular Office Systems


Modular Office Project in Flint TX

Industry: Distributor Center of Auto Cleaning Products in Flint, Texas
Challenge: Needed offices with HVAC within a warehouse without office space.
Solution: Prefabricated modular office building system.
Result: 3 day install. Fast, quality prefabricated offices with the comfort of HVAC.
Equipment:  Starrco Modular In-Plant Office Building


Our Client: Automotive Products Distributor

Since 1980, Promagic, Inc. has served their clients with the most complete line of car cleaning products and equipment throughout Flint Texas and the United States.  Just about anything you need to clean, decorate, or condition your vehicle, Promagic has it.

Challenge: Moving into a warehouse with no office space. Needs quick set up of offices in order to hit the ground running.

Due to major growth pains, they needed to move into a new warehouse that could accommodate their expansion.  They found the perfect location with the right amount of space needed, but no professional offices to conduct business out of.As we all know, Texas gets HOT in the summer months. Even within a fan-cooled warehouse, heat risk can still be a factor with dock doors opening and closing all day long.  So they needed a fully functional office space that had the comfort of air conditioning along with a high-quality professional appearance to conduct business from. 

Solution: Starrco In-Plant Office System. 3 Day Installation.

Material handling and storage planning specialist, Rode Chambers, headed up this project. After hundreds of similar in-plant office projects, this was a snap!

“They needed a well-lit, high-quality modular office installed inside their warehouse. Air conditioned, bright, and professional offices are something we can expect from Starrco,” says Chambers.

W.W. Cannon’s in-house team of professional installers went to work.  A modular building was constructed complete with windows, solid door, and a quiet HVAC ceiling ventilated system. Installation took a quick 3 days for the entire office to be ready for use.

Result: Cool, clean, fast professional office space – up and running in only 3 days.

Our customer was able to conduct business fast with normal office hours within a climate-controlled, fully functional space.  As their need for office space grows, they’ll be able to easily expand into more offices with the reconfigurable, prefabricated building system.

“Even better, as their office needs grow, they’ve got plenty of space and we can simply add new offices on to the modular system.  They’re very happy with the solution,” stated Chambers.

Next Steps

Our team of specialists know how to turn your space challenges into efficient results. Call us. Let’s talk through what you’re dealing with and where you’d like to see improvements. We can get you there.

Get a product or service estimate within 2 business days or less with our quick quote form. If you need faster pricing, call 800-442-3061.

Request Quote or Consultation

Find the Right Solution

How can we help you solve your challenges? Reach out and someone will be in touch soon for more details.


Related Stories

Manufacturer Expands and Separates Plant with Innovative Modular Solutions for an Inclusive Workplace.

Industry:  Leading manufacturer of food, agriculture, industrial and animal nutrition products and services. Challenge: Provide an all-inclusive employee area customized…

Innovative Vacuum Lifting System Solves Client’s Assembly Line Problem

Background:  Global technology leader in designing, manufacturing, and supporting premium diesel engines. The Problem They needed to boost efficiency and…

How to Choose the Proper Drum Handling Equipment for Your Application

Gather Info for Safe, Ergonomic Drum Handlers Choosing the right drum handling equipment is crucial for ensuring safety, efficiency, and…