Project Completion On Pre-Engineered Modular Building for Heavy Industry Manufacturer


Stairs lead to top floor of production office

Lean manufacturing principles are put into place as supervisors move into the completed two-story Starrco Pre-Engineered Office on the production floor.  These offices put supervisors near the work.  Windows provide a clear view of production floor.

Two Story Modular Office Completion by ww Cannon
Two Story Modular Office Completion by ww Cannon

 

 

Full view of the production floor is possible from every part of the office

Find the Right Solution

How can we help you solve your challenges? Reach out and someone will be in touch soon for more details.


Related Stories

Safety Guardrail for Warehouse Equipment & Rack Protection In-Stock Dallas TX

Machinery, Pallet Rack, Shelving all stack up short without a solid barrier to safeguard them. Install a heavy-duty guardrail barrier system…

Pet-Products Manufacturer Tames Hot Texas Warehouse with Cool In-Plant Office

We were able to design and install a cost-effective and high-quality in-plant, pre-engineered office solution with air conditioning and guardrail…

8 Time Winner! W.W. Cannon Proudly Receives MHEDA MVP Industry Award

For the 8th consecutive year, W.W. Cannon, LLC is proud to receive the reputable MHEDA MVP (Most Valuable Partner) Award…